
Wideband Gapfiller Satellite: Launched by Atlas V in March 2006.
Deep Impact Jan. 2005
NASA
Cost: $248 million
Cryosat - September 2005
Monitor E - Russian
environmental Earth research satellite. Launch by Eurockot in June 2005.
Data Relay Test Satellite (DRTS) Summer 2000
NASDA
Earth Observing One (EO-1) October 2000
NASA
Quick Total Ozone Mapping Spectrometer (QuikTOMS) November 2000
NASA
International Space Station Assembly Flight 2A 2B August 2000
NASA
International Space Station Assembly Flight 3A STS-92 Sept. 2000
NASA
The Vegetation Canopy Lidar Mission (VCL) September 2000
NASA, U Maryland
STENTOR September 2000
NASA, DGA
International Space Station Assembly Flight 2R November 2000
NASA, RSA
Microwave Anisotropy Probe (MAP) Nov. 2000
NASA, Princeton
Jason-1 Nov. 2000
NASA, CNES
International Space Station Assembly Flight 4A, STS-97 November 2000
NASA
Bird December 2000
DLR
High Energy Transient Explorer Two (HETE-2) July 2000
NASA, MIT
Cost: $9 million
Aqua December 2000
NASA, NASDA
Geostationary Operational Environmental Satellite August 2001
NASA, NOAA
International Space Station Assembly Flight 5A, ST Jan. 2001
NASA
Genesis Jan. 2001
NASA
Cost: $90 million
High Energy Solar Spectroscopic Imager (HESSI) Jan. 2001
NASA
Cost: $40 million
Triana-Total Ozone Mapping Spectrometer (Triana-TOMS) Jan. 2001
NASA
International Space Station Assembly Flight 4R Feb. 2001
NASA
International Space Station Assembly Flight 5A.1 Feb. 2001
ASI, NASA
International Space Station Assembly Flight 6A, ST April 2001
ASI, NASA
International Space Station Assembly Flight 7A, ST May 2001
ASI, NASA
International Space Station Assembly Flight 7A.1 June 2001
NASA, ASI
Inner Magnetosphere Explorer (IMEX) June 2001
NASA
Cost: $15 million
Gravity Recovery and Climate Experiment (GRACE) June 2001
DLR, GFZ
Cost: $70 million
Hubble Servicing Mission 3B June 2001
NASA
Cooperative Astrophysics and Technology Satellite (CATSAT) July 2001
UNH
Cost: $5 million
International Space Station Assembly Flight UF-1, Aug. 2001
NASA
Gravity Probe-B Sept. 2001
NASA, Lockheed Martin, Stanford
Galaxy Evolution Explorer (GALEX) Sept. 2001
Caltech, LAS, Johns Hopkins, AUSD
International Gamma-Ray Astrophysics Laboratory (INTEGRAL) Sept. 2001
ESA
Optical Inter-orbit Communications Engineering Test Satellite Winter 2001
ESA, NASDA
Deep Space 1 (DS1) Oct. 1998
NASA, SAI
Cost: $94.8 million
Space Infrared Telescope Facility (SIRTF) Dec. 2001
NASA, Caltech
Cost: $450 million
Ice Cloud and Land Elevation Satellite (ICESAT) July 2001
NASA
Advanced Earth Observing Satellite II (ADEOS-II) November 2001
NASDA
Solar Radiation and Climate Experiment (SORCE) June 2002
NASA, CU
Mu Space Engineering Spacecraft (MUSES-CN) Aug. 2002
NASA, ISAS
Small Mission for Advanced Research in Technology Late 2002
ESA
Earth Observing Satellite-Chemistry (EOS-Chem) 2002
NASA
Engineering Test Satellite-VIII (ETS-VIII) ‘02
NASDA, CRL, ESA, NRL
Advanced Land Observing Satellite (ALOS) 2002
NASDA
RadioAstron 2002
NASA, ASC, IRA, ESA, CSIRO
Two Wide-angle Imaging Neutral-atom Spectrometers 2002
NASA
Cost: $20 million (for both TWINS satellites)
Cosmic Hot Interstellar Plasma Spectrometer (CHIPS) April 2002
NASA, UC Berkeley
Cost: $15 million
Data Relay Test Satellite (DRTS) Summer ‘02
NASDA
Comet Nucleus Tour (CONTOUR) July 2002
NASA, Cornell University
Geostationary Operational Environmental Satellite Oct. 2002
NOAA, NASA
Earth Observing 3 (EO3) Dec. 2002
NASA
Cost: $105 million
Solar Radiation and Climate Experiment (SORCE) June 2002
NASA, CU
Mu Space Engineering Spacecraft (MUSES-CN) Aug. 2002
NASA, ISAS
Small Mission for Advanced Research in Technology Late 2002
ESA
Earth Observing Satellite-Chemistry (EOS-Chem) 2002
NASA
Engineering Test Satellite-VIII (ETS-VIII) ‘02
NASDA, CRL, ESA, NRL
Advanced Land Observing Satellite (ALOS) 2002
NASDA
RadioAstron 2002
NASA, ASC, IRA, ESA, CSIRO
Two Wide-angle Imaging Neutral-atom Spectrometers 2002
NASA
Cost: $20 million (for both TWINS satellites)
Cosmic Hot Interstellar Plasma Spectrometer (CHIPS) April 2002
NASA, UC Berkeley
Cost: $15 million
Data Relay Test Satellite (DRTS) Summer ‘02
NASDA
Comet Nucleus Tour (CONTOUR) July 2002
NASA, Cornell University
Geostationary Operational Environmental Satellite Oct. 2002
NOAA, NASA
Earth Observing 3 (EO3) Dec. 2002
NASA
Cost: $105 million
CloudSat March 2003
CSA, NASA, CU
PICASSO-CENA March 2003
NASA
Geostationary Imaging Fourier Transform Spectrometer (GIFTS) 2003
NASA
Cost: $105 million
Swift Gamma Ray Burst Explorer 2003
NASA
Cost: $163 million
Selenological and Engineering Explorer (SELENE) 2003
ISAS
Jason-2 May 2003
NASA
Mars Surveyor 2003 May 2003
NASA
Alpha Magnetic Spectrometer 2 (AMS2) May 2003
NASA
Mars Express 2003
ESA
Rosetta Jan. 2003
ESA
Space Technology 5 (ST5) June 2003
NASA
Cost: $28 million
Hubble Servicing Mission 4 (HSM4) July 2003
NASA
Europa Orbiter Nov. 2003
NASA
Nozomi (formerly Planet-B) July 1998
ISAS
Full-sky Astrometric Mapping Explorer (FAME) ‘04
USNO
Two Wide-angle Imaging Neutral-atom Spectrometers 2004
NASA
Cost: $20 million (total for this and ’02 mission)
Stardust Feb. 1999
NASA
Cost: $150 million
Mercury Surface, Space Environment, Geochemistry and Ranging Mission (MESSENGER) March 2004
NASA, Johns Hopkins, CU, UMICH
Geostationary Operational Environmental Satellite (GEOS-O) April 2004
NASA, NOAA
Solar Terrestrial Relations Observatory (STEREO) June 2004
NASA, Johns Hopkins
Cost: $149 million
Cassini Oct. 1997
NASA, ESA, ASI
Cost: $1.42 billion
Solar-B Aug. 2004
ISAS
Satellite Test of the Equivalence Principle (STEP) Aug. 2004
NASA, ESA
Pluto-Kuiper Express December 2004
NASA
Space Technology 3 (ST3) March 2005
NASA
Cost: $140 million
Gamma-ray Large Area Space Telescope (GLAST) Sept.2005
NASA
Cost: $200 million
Reference:
http://space.popsci.com/space/
date=)Tues 18th, July, 2000
If you have any suggestions or comments, click on the email address.
spaceprojectsandinfo@aerospaceguide.every1.net
Goto
Spacecraft Guide
Goto Space Projects and Info
Home Page